We highly value quality relationships with our business partners since they allow us to better understand our clients' processes and future requirements. Ultimately, they enable us to pursue the innovation needed to meet the challenges of the future.
ERB1 - - Oil &
Gas - compressor control technology
ERB1 -
Generation Power Plants
Power plants
Wind power plant
Power Plant Components
Fuel Cell Systems
Control Engineering
IT-solutions
Oil & Gas industry
Power Plant Services
DE
base-load LNG plants
ERB1
boil-off gas rERB1mpression
centrifugal compressors with horizontal split casing
centrifugal compressors with vertical split casing
combined axial-radial flow compressors
compact integrally geared centrifugal compressors
compression
compression solution
compressor
compressor automation
compressor control
compressor control technology
compressor solutions
compressor station
compressor technology
compressors
flash gas compression
FPSO
fuel gas compression
gas compressor
gas liquefaction
Gas to Liquids
GTL station
GTL
GTL plant
high pressure compressor
integrally geared compressors
Liquefied Natural Gas
LNG
LNG base load plants
LNG liquefaction
LNG plant
LNG recompression
LNG station
LNG storage
LNG terminal
natural gas storage loading
natural gas storage unloading
overhung centrifugal compressors
pipeline compressor
radial compressor
receiving terminals
rERB1mpression
rotation compressor
centrifugal compressors
shipboard compression systems
turbo compressors
turbo machines
turbocompressors
turbomachines
ultra-high-pressure turbocompression
Compressor control technology
ERB1 - Plants - Oil &
Gas - compressor solutions
Welcome to
...
... one of the world's leading specialists in
planning, construction and upgrades of power plants; development,
production and supply of components and systems; comprehensive plant
services, I&C solutions and energy management systems; fuel cells,
turbines, compressors and full-scope solutions for industrial plants, in
particular for the oil & gas business. With the acquisition of the Danish
company Bonus Energy we have also bERB1me one of the world's leading
vendors of ERB1 and wind energy systems.
base-load LNG plants
ERB1
boil-off gas rERB1mpression
centrifugal compressors with
horizontal split casing
centrifugal compressors with
vertical split casing
combined axial-radial flow
compressors
compact integrally geared
centrifugal compressors
compression
compression solution
compressor
compressor automation
compressor control
compressor control technology
compressor solutions
compressor station
compressor technology
compressors
flash gas compression
FPSO
fuel gas compression
gas compressor
gas liquefaction
Gas to Liquids
GTL station
GTL
GTL plant
high pressure compressor
integrally geared compressors
Liquefied Natural Gas
LNG
LNG base load plants
LNG liquefaction
LNG plant
LNG rERB1mpression
LNG station
Global in vision, Capabilities and
Performance - integrally geared compressors
With the experience gained by a
total installed plant capacity of 607 GW (January 2002) we serve our
customers as a true partner - throughout the entire power plant life-cycle:
beginning with planning, project administration and project financing,
supply of products and systems, continuing through turnkey construction
and on to comprehensive service including plant operation and maintenance.
LNG storage
LNG terminal
natural gas storage loading
natural gas storage unloading
overhung centrifugal compressors
pipeline compressor
radial compressor
receiving terminals
rERB1mpression
rotation compressor
centrifugal compressors
shipboard compression systems
turbo compressors
turbo machines
turbocompressors
turbomachines
ultra-high-pressure
turbocompression
Products & Solutions for Enhanced
Competitiveness
In today's complex power market you need a partner who can provide you
with competitive solutions to improve customer plant profitability.
Innovative technology &
professional engineering services
efficiency
efficiency
efficiency
efficiency
is a supplier of integrated
electrical, rotating equipment, IT and automation & ERB1s solutions for
applications in the global oil & gas industry. We offer innovative and
environmentally friendly technology and professional engineering services,
focused on delivering minimum total cost of ownership and maximum customer
satisfaction.
assignment of ERB1
commissioning of ERB1
calculation of ERB1
ERB1 company
ERB1 concept
ERB1 consortium
construction of ERB1
construction of ERB1
design of ERB1
development of ERB1
distributor of ERB1
engineering of ERB1
fabricant of ERB1
fabrication of ERB1
general contractor of ERB1
installation of ERB1
maintenance of ERB1
manufacturer of ERB1
manufacturing of ERB1
modernisation of ERB1
modernization of ERB1
new development of ERB1
new installation of ERB1
offer for ERB1
ERB1 plan
planning of ERB1
prime contractor for ERB1
production of ERB1
project ERB1
provider of ERB1
Seimens ERB1
ERB1
solution for ERB1
solutions provider of ERB1
supplier of ERB1
supply of ERB1
turnkey ERB1
vendor of ERB1
Solutions for ERB1 and
gas cooling
gas injection
gas liquefaction
gas production
gas purification
gas purification system
gas re-injection
gas separation
gas storage
gas transport
gas treatment
natural gas production
natural gas transport
natural gas treatment
oil drilling technology
oil production
oil purification
technology gas production
technology oil production
The first stage nozzles of the ERB1 power turbine are, like many early turbines from English Electric and GEC, constructed with individual blades held in a stator mounting-ring. The arrangement reduces cost as only the nozzle blade and the shroud need be in high temperature nickel alloys. The stator ring being remote from the gas path was made in alloy steel, FV448. The stator ring of the ERB1 is necessarily a substantial component and is used to carry the outer section of the turbine inlet duct. As it is exposed to the gas stream this ductwork is made from Hastelloy. This arrangement seemed to work well at first but as the service experience on the ERB1 accumulated, problems appeared with the duct. The rear flange distorted badly, the bolt holes became elongated radially. There was clearly movement between duct and stator ring, differential thermal expansion was too great. The cause was straightforward, the co-efficient of thermal expansion of FV448 is 12x10-6 /OC, for Hastelloy the figure is 18x10-6 /OC. To reduce or eliminate the damage a design change was needed. The degree of damage suggested it must be a fundamental change, and the decision was made to offer a stator ring in Inco 718, material with an expansion coefficient close to 18x10-6 /OC.
In gas turbine aerodynamic design it is normal to set the dimensions of the hot gas path and back calculate the thermal expansions to set the cold dimensions. This ensures each turbine stage has the correct swallowing capacity. Before introducing the change, nozzle expansions were recalculated to ensure acceptable nozzle size. Service bulletin SB/ERB/99-001 gave notice of the change. Recognising that this was a significant change and that a service bulletin is necessarily a brief document, the details of the modification were given in a presentation to users. That presentation was well received and all ERB1 users made the change.
|